COMMERCIAL · INDUSTRIAL · AGRICULTURAL ENERGY

Solar and battery solutions for Factories and Manufacturing

Manufacturing facilities need an energy design that reflects production shifts, machinery, motor loads, demand peaks and the cost of interrupted operations. End Loadshedding reviews industrial solar and battery enquiries using site-specific electrical and operational information.

Project availability, site assessment, technical scope and installation arrangements are confirmed individually. This page describes the type of projects we assess, not a guarantee that every site or application is suitable.

UNDERSTAND THE OPERATION

Solar planning for Factories and Manufacturing.

A factory load profile can change significantly between shifts, production lines and start-up periods. A useful design begins with interval consumption and demand data, then identifies the circuits that can be supported by PV and storage without compromising the plant’s electrical requirements.

What we need to assess

  • Interval data, maximum demand and production schedules
  • Motor loads, starting currents and variable-speed drives
  • Critical production lines and shutdown procedures
  • Power quality, protection coordination and grid interface
  • Roof condition, structural constraints and PV layout
  • Expansion plans and the need for staged system capacity

How system capacity is selected

The 20kW, 40kW, 50kW, 80kW and 100kW examples on our website are illustrative configurations. The appropriate system depends on the site load profile, peak demand, operating schedule, electrical supply, available PV area, battery duty and grid requirements. A technical review is required before a design or performance estimate can be confirmed.

For background on the available configurations, visit the commercial high-voltage solar range.

PROJECT ASSESSMENT

From operating data to project scope.

We establish the site's electrical requirements before confirming system selection, pricing or installation scope.

01

Review energy use

Study bills, interval data, demand peaks and operating schedules.

02

Identify critical loads

Understand which processes need support and for how long.

03

Assess the site

Review PV space, electrical infrastructure and grid requirements.

04

Document the proposal

Confirm equipment, scope, assumptions, exclusions and programme.

PROJECT FAQs

Factories and Manufacturing solar project questions

Can a commercial solar system run factory machinery?

It may support suitable loads, but motor characteristics, start-up demand, power quality and inverter architecture must be checked. The system should be designed around the actual equipment schedule.

Can solar reduce a factory electricity bill?

PV can offset some grid consumption when generation aligns with the facility load. Actual savings depend on tariffs, demand charges, operating hours, system design, weather and export arrangements.

What information is needed to assess a factory?

Provide recent bills, interval data, maximum demand, shift schedules, a list of major motors and critical loads, site address and details of the electrical supply.

Do you install the same system size at every site?

No. The illustrated 20kW to 100kW configurations are examples. Equipment selection, system capacity, installation scope and expected operation must be confirmed for each site.

END LOADSHEDDING · PROJECT ENQUIRIES

Let's assess your site's energy requirements.

Request a project proposal for your operation.

Chat with us