Solar and battery solutions for Durban and Pinetown businesses.
For coastal and industrial properties, the design process should consider equipment location, environmental exposure, roof condition, electrical protection, grid interface and the loads that must remain supported. Battery autonomy should be calculated from the intended backup loads, not simply the inverter rating.
Businesses and facilities we can assess
- Manufacturing and industrial operations
- Warehouses and logistics facilities
- Cold storage, food processing and refrigeration
- Commercial properties and business parks
Plan around the site's real energy use
Before selecting a system, we review electricity consumption, peak demand, operating hours, critical loads, the available roof or ground area, the electrical supply and the project’s backup objectives. A 20kW, 40kW, 50kW, 80kW or 100kW package should only be selected when its configuration is suitable for the site.
Enquiries from Pinetown, Westmead, Springfield, Riverhorse Valley, Prospecton and nearby KwaZulu-Natal areas can be discussed subject to project logistics.
