Solar planning for Mining and Heavy Industry.
The assessment must distinguish essential services from high-demand process equipment and understand how the facility operates during normal conditions, planned maintenance and grid interruptions. Site access, safety induction, environmental exposure and grid connection requirements can materially affect the project scope.
What we need to assess
- Load studies, demand profiles and critical process circuits
- Motor starting, power quality and protection coordination
- Site access, safety requirements and operating constraints
- PV land availability, dust, shading and environmental exposure
- Grid connection, utility approvals and control integration
- Battery duty, redundancy, maintenance and lifecycle planning
How system capacity is selected
The 20kW, 40kW, 50kW, 80kW and 100kW examples on our website are illustrative configurations. The appropriate system depends on the site load profile, peak demand, operating schedule, electrical supply, available PV area, battery duty and grid requirements. A technical review is required before a design or performance estimate can be confirmed.
For background on the available configurations, visit the commercial high-voltage solar range.