Solar and battery solutions for Johannesburg businesses.
A useful commercial assessment considers the site’s maximum demand, operating hours, load profile, available PV area, grid connection and the equipment that needs backup. These factors determine whether a 20kW to 100kW illustrated system is appropriate or whether a different design is required.
Businesses and facilities we can assess
- Manufacturing and engineering facilities
- Warehouses and distribution centres
- Commercial buildings and multi-tenant properties
- Food processing, refrigeration and logistics operations
Plan around the site's real energy use
Before selecting a system, we review electricity consumption, peak demand, operating hours, critical loads, the available roof or ground area, the electrical supply and the project’s backup objectives. A 20kW, 40kW, 50kW, 80kW or 100kW package should only be selected when its configuration is suitable for the site.
Project enquiries from greater Johannesburg and surrounding Gauteng business districts are considered subject to site access, logistics and installation scheduling.